Author | Urinary diversion | Length of stay cost (ORC) | Length of stay cost (RARC) | Mean length of stay (ORC) (days) | Mean length of stay (RARC) (days) |
---|---|---|---|---|---|
Bansal [13] | Ileal conduit, Orthotopic neobladder | $6314 (46.7%) | $4836 (30.1%) | 12.5 | 8.8 |
Bochner [23] | Ileal conduit, Orthotopic neobladder | N.A. (included in total cost) | 8 | 8 | |
Martin [21] | Ileal conduit | N.A. (included in total cost) | 10 | 5 | |
Lee [22]b | Ileal conduit, Orthotopic neobladder, Continent cuteneous | $8592 (33.7–41.5%) | $5907 (26.0–28.6%) | 8a | 5.5a |
Smith [11] | N.A. | $4982 (30.7%) | $4418 (30.2%) | 5.3b | 4.7b |